Sharp Electronics were looking to consolidate three UK offices and subsequently acquired a space at Stockley Park, Uxbridge, which not only provided the staff with an inspirational working environment but as a showcase for their latest technology.
Kanvas worked alongside DTZ to create a working environment which was both innovative and stimulating reflecting the client’s corporate values and culture. Due to the condition of the base build installation, time frames became tight and fit out budget affected, but the team ensured all key milestones and specifications were exceeded.
Location
Stockley Park, Uxbridge
Size
55,000 sq ft
Features
Following the creation of an accommodation strategy for the new premises, the complete fit out included a prestigious reception with a strong brand presence, a minimalist, light, clean and structured working environment and Japanese themed restaurant. A solar panel was installed onto the roof to reduce the client’s carbon footprint.
Duration
20 Week Construction Programme
|
 |
|
|
 |
 |
|
|